story · 3 scenes
Deploys
Deploy liftoff
Each build-log line inflates a hot-air balloon by its share; when the health check passes it lifts off flying an online pennant.
Press QA
Builds roll off a press and under an inspector; an arm flicks the one with a failing test down a chute, back to the plate, and it passes on the second run.
Projector sheets
Production, staging and a pull request stack as acetate sheets on a projector; lift the PR sheet off and the wall snaps back to staging.